If all goes as planned 2021 will be stellar
With some bat-**** crazy ideas , I have jumped on the wagon early and purchased 1/2 dozen of these for prop control .
If you have had any experience with these modules good or bad I'd like to hear from you .
My plan is to have everything built and up for testing between July & August with all kinks ironed out for mid Sept. I do not want to have last minute or installation issues when the weather is nasty .
With some bat-**** crazy ideas , I have jumped on the wagon early and purchased 1/2 dozen of these for prop control .
If you have had any experience with these modules good or bad I'd like to hear from you .
My plan is to have everything built and up for testing between July & August with all kinks ironed out for mid Sept. I do not want to have last minute or installation issues when the weather is nasty .