16 Channel Renard with SSR Assembly Instructions: Difference between revisions

From doityourselfchristmas.com
Jump to navigation Jump to search
Line 35: Line 35:
| colspan=5 align="center"|Numbered Photo
| colspan=5 align="center"|Numbered Photo
[http://www.christmasinshirley.com/forum/album_pic.php?pic_id=49]
[http://www.christmasinshirley.com/forum/album_pic.php?pic_id=49]
 
[[image:http://www.christmasinshirley.com/forum/album_pic.php?pic_id=49]]


|-
|-

Revision as of 05:36, 16 June 2007

Overview

  • Assembly Time: 2 hours
  • Skill Level: Medium

Disclaimer

Use of this material is undertaken at the users own risk. We assume no responsibility for any consequences you encounter by using the information here.

Tools

  • Bench Soldering Iron
  • Silver Solder
  • Flat cut dykes
  • Desoldering bulb


Build Steps

Install Item Qty Mouser P/N Location Notes
1. IC sockets 6 pin 17 571-3902611 U3-U19 Make sure they are oriented the same way as the silk screen image. U19 is oriented opposite of the others
2. IC Sockets 8 Pin 2 575-193308 U20 & U21
3. IC Sockets 14 Pin 2 575-199314 U1 & U2
4. Bossman Fuse Holder 4 504-1a3399-10 H1 & H2 pads Make Sure the notch on the fuse holder are oriented so one is on the top and the other on the bottom to properly hold the fuse.
5. Euro Sytle Terminal Blocks 11 538-398890-0302 Lower Edge of Board
6. 15Kohm REsistors 2 71-ccf60-15k-e3 R17 & R18
7. 178 ohm resistor 16 273-178-rc R1 - R16 Orient the color all the same way for easy of troubleshooting later
8. 10pin 680ohm bus resistor 2 266-680 above U7 & U15
Numbered Photo

[1] File:Http://www.christmasinshirley.com/forum/album pic.php?pic id=49

6. 1 11-11 spot1
6. 1 11-11 spot1
6. 1 11-11 spot1
6. 1 11-11 spot1
6. 1 11-11 spot1
6. 1 11-11 spot1
6. 1 11-11 spot1


Still Entering Give me so time to finish before you edit this please