16 Channel Renard with SSR Assembly Instructions
Overview
- Assembly Time: 2 hours
- Skill Level: Medium
Disclaimer
Use of this material is undertaken at the users own risk. We assume no responsibility for any consequences you encounter by using the information here.
Tools
- Bench Soldering Iron
- Silver Solder
- Flat cut dykes
- Desoldering bulb
Build Steps
Item | Qty | Mouser P/N | Location | Notes |
---|---|---|---|---|
1. Install IC sockets 6 pin | 17 | 571-3902611 | U3-U19 | Make sure they are oriented the same way as the silk screen image. U19 is oriented opposite of the others |
2. Install IC Sockets 8 Pin | 2 | 575-193308 | U20 & U21 | |
3. Install IC Sockets 14 Pin | 2 | 575-199314 | U1 & U2 | |
4. Install Bossman Fuse Holder | 4 | 504-1a3399-10 | H1 & H2 pads | Make Sure the notch on the fuse holder are oriented so one is on the top and the other on the bottom to properly hold the fuse. |
Spot for Picture |
Still Entering Give me so time to finish before you edit this please