Creating and Running a Schedule: Difference between revisions

From doityourselfchristmas.com
Jump to navigation Jump to search
No edit summary
No edit summary
 
Line 9: Line 9:
----
----


[[File:HLS_Schedule_ShowSchedule.png|thumb|Figure 9-18]]
[[File:HLS_Schedule_ShowSchedule.png|350px|thumb|Figure 9-18]]
*Click ''Output -> Create/Modify Show Schedule'' (see Figure 9-18).
*Click ''Output -> Create/Modify Show Schedule'' (see Figure 9-18).
*Left-click on a blank space for the day you wish to schedule.
*Left-click on a blank space for the day you wish to schedule.
<br clear=all>
<br clear=all>


[[File:HLS_Schedule_ShowEvent.png|thumb|Figure 9-19]]
[[File:HLS_Schedule_ShowEvent.png|350px|thumb|Figure 9-19]]
*The Show Event window will open (see Figure 9-19).
*The Show Event window will open (see Figure 9-19).
*''Select Playlist'' and choose desired playlist from list and click ok.
*''Select Playlist'' and choose desired playlist from list and click ok.
<br clear=all>
<br clear=all>


[[File:HLS_Schedule_SelectTime.png|thumb|Figure 9-20]]
[[File:HLS_Schedule_SelectTime.png|350px|thumb|Figure 9-20]]
*Click Select Start/End Time (see Figure 9-20).
*Click Select Start/End Time (see Figure 9-20).
*Select any additional options, then click ok.
*Select any additional options, then click ok.
Line 29: Line 29:
----
----


[[File:HLS_Schedule_ShowScheduleCopy.png|thumb|Figure 9-21]]
[[File:HLS_Schedule_ShowScheduleCopy.png|350px|thumb|Figure 9-21]]
*To copy a configured show from one day to another, right click on the cell you wish to copy.
*To copy a configured show from one day to another, right click on the cell you wish to copy.
*The selected cell will turn "yellow".
*The selected cell will turn "yellow".
Line 48: Line 48:
----
----


[[File:HLS_Schedule_PlayShowSchedule.png|thumb|Figure 9-22]]
[[File:HLS_Schedule_PlayShowSchedule.png|350px|thumb|Figure 9-22]]
*Click ''Output -> Play Show Schedule''.
*Click ''Output -> Play Show Schedule''.
*Select the playlist you wish to play.
*Select the playlist you wish to play.

Latest revision as of 04:45, 24 March 2013

Introduction


Schedules are used to automatically run specific playlists at desired times and days during a week.


To Create a Show Schedule:


Figure 9-18
  • Click Output -> Create/Modify Show Schedule (see Figure 9-18).
  • Left-click on a blank space for the day you wish to schedule.


Figure 9-19
  • The Show Event window will open (see Figure 9-19).
  • Select Playlist and choose desired playlist from list and click ok.


Figure 9-20
  • Click Select Start/End Time (see Figure 9-20).
  • Select any additional options, then click ok.
  • When your schedule is complete, click OK.



To Copy/Paste:


Figure 9-21
  • To copy a configured show from one day to another, right click on the cell you wish to copy.
  • The selected cell will turn "yellow".
  • Right-click in the new cell that you want to copy the show into.
  • The copied show will now be in the new cell.



To Delete/Modify:


  • Left-click on the cell with the schedule you wish to delete or modify.
  • This opens the Show Event window (see Figure 9-19). From here, you can make any changes you need.
  • To Delete from that selected cell, check the Delete from Show button and click ok.


To Run a Scheduled Show:


Figure 9-22
  • Click Output -> Play Show Schedule.
  • Select the playlist you wish to play.
  • Ensure Play per Scheduled Show radio button is selected.



HLS User Manual and Reference Guide
Previous Page Current Chapter Next Page
Working with Playlists Chapter 9: Sequence Output Chapter 10: Advanced Features